January 7, 2009


March 12, 2009 – Excavation began


March 15, 2009 – Groundbreaking Ceremony

Pictured from left to right: Superintendent Tom Norling (Septagon Construction Co, Inc), Vice Chairman Ken Hoover (Emergency Services Board), Chairman Cliff Gronauer (Emergency Services Board), Construction Consultant Brian Maenner (Septagon Construction Co, Inc), Board Member Harry Divins (Emergency Services Board), Board Member Ed Lang (Emergency Services Board), 911 Director Chris Hardin (Joint Communications), Board Member Paul Day (Emergency Services Board), Board Member Jack Allison (Emergency Services Board), Assistant 911 Director Dan Barnett (Joint Communications), and Dispatch Supervisor Shelly Rahmouni (Joint Communications).
Not pictured: Board Member Bill Arndt (Emergency Services Board).
March 24, 2009 – Exterior rendering released

March 25, 2009 – The footers have been poured and the forms are going up for more concrete



March 30, 2009 – Final rendering released

April 15, 2009 – Concrete floor poured


April 22, 2009 – Bedford Masonry laying block


May 2, 2009 – Bedford Masonry continues laying block


May 18, 2009 – Most of the exterior block has been laid


June 9, 2009 – The exterior walls are up and work continues



June 18, 2009 – Generator delivered, sidewalks being poured and interior walls being framed




July 16, 2009 – Brick is finished


July 22, 2009 – Excavation underway for radio tower

August 10, 2009 – The parking lot has been paved and lined


August 13, 2009 – Radio tower construction underway

August 18, 2009 – Radio tower construction complete



August 21, 2009 – Glass has been installed in the windows and front door. Landscaping being done.


September 11, 2009 – Dispatch consoles installed.


September 13, 2009 – Antennas being installed on the radio tower.


September 18, 2009 – Mid Mo Signs has finished installing the lettering on the building.


September 25, 2009 – Septagon has installed the lobby plaque.

September 29, 2009 – Vandiver Village has installed the Dispatch Drive sign at Oross Street.